TSMC confirmed talks on Musk's $16.8 billion Terafab and set one condition: TSMC runs it
TSMC confirmed live talks on Elon Musk's $16.8 billion Texas chip project and set one condition: TSMC runs the fab. The standoff is not about money but about process control, and record results are what let TSMC hold the line.
Richard Tang · 3 min read
On its October 15 earnings call, TSMC−1.54% — TSMC, down 1.54 percent today confirmed negotiations over Terafab, the Tesla−1.32% — Tesla, down 1.32 percent today-SpaceX−2.14% — SpaceX, down 2.14 percent today-xAI$200B — xAI, private, latest valuation $200B chip project in Grimes County, Texas, and its chief executive C.C. Wei set one condition: "the fab got to be run by TSMC" 1. The condition is the substance of the deal, not an opening bid. TSMC, the world's largest contract chipmaker, sells the running of advanced chip plants, and Musk's sublease offer would leave it a tenant in a factory someone else operates 62.
Terafab's first phase, about $16.8 billion, broke ground in August on a former coal plant site, targeting roughly a terawatt of annual AI compute for Musk's cars, robots and data centers 21. A week before the call, Musk posted that his companies would build and operate the plant themselves: "Maybe TSMC subleases part of the Terafab if they want, but nothing more than that" 2.

Musk wants iteration speed; TSMC is selling yield
Musk's reasoning is genuine. He wants a research fab that can make, test and revise about ten chip designs a year under one roof, against roughly two years for a single significant design to reach volume production today 3. His framing concedes the catch: "I have no idea how to make chips, but we'll figure it out" 3.
Wei's refusal has a technical basis. Advanced fabs are not interchangeable cleanroom shells: each runs proprietary process flows, tools, materials and yield-management systems tuned together, and yield, the share of chips that come off the line working, is knowledge the operator accumulates over decades 4. A TSMC line sharing a campus with Intel−2.85% — Intel, down 2.85 percent today-derived manufacturing would in practice be a separate fab, not a conventional sublease 4.
Every TSMC joint venture abroad is run by TSMC
That is also the only template the company has. On the call, an analyst asked whether a Terafab deal would follow TSMC's joint ventures in Japan and Germany, both of which TSMC runs 1. "We are still in discussion," Wei said, offering no timeline 1.
Reporting on the talks assumes the same shape: TSMC owns and operates a Texas fab, and SpaceX signs on with equity or guaranteed purchase agreements 5. If no deal lands, the process of record becomes Intel's 14A, its next-generation node 4. Intel has been a development partner since April, and its chief executive Lip-Bu Tan said last week the company stays 21.
The record quarter pays for the standoff
TSMC can hold this line because it is turning business away. Analyst Sravan Kundojjala of the chip research firm SemiAnalysis notes that TSMC screens customer orders for the financing and parts needed to actually deploy the systems, and demand still comes out well above its supply 6.
The record explains the confidence. Net profit hit NT$763.1 billion, up 68.7 percent, a sixth consecutive quarter of record earnings 6. Dollar revenue rose 41 percent, and fourth-quarter sales are guided to $52.3–54.3 billion 1. The stance is underwritten by a $265 billion US buildout, a finished second fab in Arizona and Texas site scouting already under way 61.
TSMC's profit has set an all-time high every quarter since Q2 2025
Data
| Net income | |
|---|---|
| Q1 '24 | $7.05B |
| Q2 '24 | $7.62B |
| Q3 '24 | $10.3B |
| Q4 '24 | $11.07B |
| Q1 '25 | $10.95B |
| Q2 '25 | $13.63B |
| Q3 '25 | $14.84B |
| Q4 '25 | $15.53B |
| Q1 '26 | $17.88B |
| Q2 '26 | $22.16B |
The 2026 capital budget is set at $60–64 billion, a plan sized to keep building through a standoff 7.
TSMC's 2026 capital budget jumps to a guided $60–64 billion
- Estimate
Data
| Value | Range | |
|---|---|---|
| 2024 | $29.8B | — |
| 2025 | $40.9B | — |
| 2026 (guided) (estimate) | $62B | $60–64B |
Each side's owners carry a different risk
For investors the split is clean. TSM holders get a Texas fab on TSMC's terms or none; Intel holders own the fallback node; Tesla shareholders and SpaceX's private backers carry the risk that Terafab learns chipmaking on the job.
The signals to watch are concrete: formal announcements from TSMC or SpaceX on who does what, how Intel's 14A process would coexist with a TSMC line on one campus, and construction progress at the Gibbons Creek site 2. The terawatt becomes real when the tools are run by people who already know the work, and on October 15 the best operator in the business named its price: control.
Deepdive
AI-generated from this story and its cited sources. Not investment advice.


