Power

Southern's Georgia Power and Alabama Power hold $26.5 billion of federal energy loans, the most in DOE history

The first published ranking of the Energy Department's loan book puts Georgia Power and Alabama Power first, and the November 18 tally shows the whole $73.2 billion book now finances reactors and wires rather than wind, solar or electric vehicles.

Richard TangRichard Tangtwo-minute read
Share
Chris Womack, chairman, president and chief executive of Southern Company, smiling with arms folded
Chris Womack, chairman, president and chief executive of Southern Company, whose Georgia Power and Alabama Power units hold $26.5 billion of the Energy Department's loans.

Southern Company's−1.19% — Southern Company, down 1.19 percent as of its last quote two biggest utilities now hold the largest federal energy loan in Department of Energy history: $26.5 billion for Georgia Power and Alabama Power, part of the first published ranking of the department's loan book, which the Daily Caller News Foundation counted from the department's own releases on November 18 1. Fifteen deals worth up to $73.2 billion have been closed or offered since January 2025, ten of them closed for about $43.4 billion, and none finance wind, solar or electric vehicles 1.

Southern's $26.5 billion loan is five times the next largest deal

0B10B20B30BSouthern utilities (GA and AL Power)26.5BAlliant Energy closed loan5.1BWyoming Intertie (offered)2.8BNextEra Duane Arnold1.9BConstellation Crane restart1BNuclear commitments, all deals: $29.6B
Data
Value
Southern utilities (GA and AL Power)26.5B
Alliant Energy closed loan5.1B
Wyoming Intertie (offered)2.8B
NextEra Duane Arnold1.9B
Constellation Crane restart1B
Largest Energy Department loans closed or offered since January 2025, $ billions. Southern's figure combines Georgia Power and Alabama Power. The line marks the $29.6 billion of nuclear commitments across all fifteen deals, which Southern's single loan nearly matches. Source: Daily Caller News Foundation count of department releases, November 18, 2026.1

The Southern loans pay for more than 16 gigawatts of new or upgraded generation, from gas plants and nuclear uprates to hydropower and storage 1. That makes the federal government the biggest single lender behind Southern's AI-power build. Two other pockets stand beside it, and both closed in the past week.

Southern's capital spending has topped operating cash flow in eight of the last twelve quarters

  • Capital spending
  • Operating cash flow
$0B$2B$4B$6BQ1 '24Q3 '24Q1 '25Q3 '25Q1 '26Q3 '26
Data
Capital spendingOperating cash flow
Q4 '23$2.76B$1.81B
Q1 '24$2.14B$1.31B
Q2 '24$1.98B$2.69B
Q3 '24$2.21B$3.62B
Q4 '24$2.52B$2.17B
Q1 '25$2.6B$1.25B
Q2 '25$2.64B$2.18B
Q3 '25$3.1B$3.77B
Q4 '25$4.05B$2.6B
Q1 '26$3.2B$1.23B
Q2 '26$3.13B$3.05B
Q3 '26$3.26B$3.6B
Southern Company capital spending and operating cash flow by quarter, $ billions, as reported in its SEC filings. The gap is what federal loans, customer minimum bills and the $2.0 billion of equity units closed on November 17 fund.6

Two other pockets fund the build, and both closed this week

The second pocket is customers. On the November 5 earnings call, management said signed large-load contracts, now 21 gigawatts across Alabama, Georgia and Mississippi, carry fixed minimum bills covering at least 100% of the cost each new customer adds, so Southern recovers that cost before a kilowatt moves 2. The third is shareholders: on November 17 Southern closed 40 million equity units, $2.0 billion with the over-allotment 3. An equity unit is a note plus a contract: holders collect 8.625% a year now and are obligated to buy Southern stock for $50 a unit by December 15, 2029 3.

The signed 21 gigawatts are the collateral; the 7 unsigned are the bet

Those minimum-bill protections cover only what is signed. Another 7 gigawatts sit in late-stage negotiations, unprotected 2, and Georgia's new politics aim at exactly them. Governor-elect Keisha Lance Bottoms has pledged to sign an executive order pausing new data centers statewide once she takes office in January; the order is not signed, and its reach is not yet defined 5. Marietta extended its data center moratorium through 2027 the same week 5. In Effingham County, commissioners approved OpenAI's 1,400-acre Project Camellia site plan on November 17 but tabled a moratorium to January; the chairman, a Southern Company employee, recused himself 4.

The signed gigawatts are locked; the answer lands in February

So the decision for a Southern holder: the signed 21 gigawatts, backed by federal loans and minimum bills, are already locked 2. If the pause reaches only projects not yet signed, the stock carries on the contracts alone, and the 7 unsigned gigawatts price at zero 2. Southern's February 2027 capital-plan refresh, alongside the January county votes, is where the answer lands 2.

Get Power by email, free

How AI's hunger for electricity moves utilities, power plants and the grid. In our daily email, every weekday.

Loading SO

Reader comments

0 comments

    Power

    BMO upgrades Bloom Energy and cuts its target to $230 as its record quarter burned $181 million of cash

    A long-time skeptic turned bull on Bloom's fuel cells and their milestone-based payments. Those same milestones are why record revenue still burned cash, and the fourth-quarter report, with 2027 guidance, decides which reading holds.

    Power

    Vistra registered 5 million Cogentrix shares, about $624 million, for resale as its buyback grows

    Vistra funded its Cogentrix gas-fleet purchase partly in its own stock, registered for resale Nov 9 with a lock-up ending Jan 30, just as the board added $1.5 billion to the buyback. Shareholders who bought the buyback story face roughly $624 million of incoming supply while only 78% of 2028 output is hedged.

    Power

    Louisiana defers Entergy's private grid hearing for Meta to Dec. 16 as a $12.9 billion gas-plant vote nears

    The same December docket now holds a consultant's verdict on Entergy's next rate increase, a hearing on the private grid serving Meta, and the vote on $12.9 billion of gas plants. Whose money carries it moves ETR shareholders and Louisiana ratepayers alike.

    Power

    PG&E signs 20-year Avantus contracts for 800 MW of solar and storage, pending CPUC approval

    The contracts still need approval from the California Public Utilities Commission, and PG&E's third-quarter filing shows the utility's operating cash running $3.4 billion behind its capital spending over the first nine months of 2026. Avantus's backers at KKR and EIG take the construction risk; the 20-year payment obligation lands on PG&E, its lenders and California ratepayers.

    Power

    NRG Energy sells six gas plants to LS Power for $4 billion, pricing one Texas plant at $1,400 per kilowatt

    The 8x cash offer implies about 40% more for the running Texas plant than NRG says new build costs. Neither the deal filing nor the 2027 guidance, which still counts the six plants, values the 20 GW NRG keeps.

    Power

    Dominion Energy sells $1.2 billion of bonds at 5.25% and 5.95% as Virginia weighs NextEra's $67 billion deal

    The pricing was disclosed the day before Virginia opened hearings on NextEra's $67 billion takeover, where the companies refused a rate freeze and promised a credit upgrade. The coupons are what the AI build-out costs without the merger, and a January ruling decides who pays them.

    Subscribe to TheInference for free