Chips

Texas names Sherman ideal for a two-plant, $45 billion chip project, and TSMC is the presumed buyer

State site-screening documents name Sherman, Texas as ideal for a two-plant, $45 billion project with no buyer attached, and TSMC is the presumptive one. The capex bill arrives years before the revenue, in a city where Texas Instruments is already spending $46 billion.

Vincent JiangVincent Jiang · 3 min read
Share
A TSMC fabrication plant under construction, steel frame rising behind site fencing
1 / 7Slide 1 of 7
TSMC's Fab 22 under construction in Kaohsiung, Taiwan, in April 2024. The Sherman site in Texas would add two more plants if the state's screening choice becomes a deal.

Sherman, Texas, sits 15 miles south of the Red River, and state paperwork now puts it first in line for a two-plant, $45 billion chip complex 1. Site-screening documents obtained by The Real Deal, reported on October 30, 2026, describe a search for two fabrication plants and the $45 billion to build them, with a state note calling Sherman an ideal candidate 1. The documents do not name the company 1. The same day, TSMC's−5.31% — TSMC, down 5.31 percent today New York-listed shares fell 5.95 percent in a selloff that stripped 7.2 percent from the Philadelphia Semiconductor Index 2.

The buyer is unnamed; the schedule is not

The presumptive buyer is Taiwan Semiconductor Manufacturing, producer of more than 90 percent of the world's most cutting-edge chips, already pledged to $265 billion in Arizona 3. Bloomberg has reported the company sizing space in the Dallas-Fort Worth metroplex 1, and chief executive C.C. Wei said on October 15: "We sent the teams to Texas to do all the evaluation" 3. The September quarter was the best in the company's history: revenue of $46.72 billion, up 41.2 percent, at a 66.4 percent gross margin, with fourth-quarter guidance of $52.3 billion to $54.3 billion 45.

The bill lands years before the revenue

This year's capital budget runs $60 billion to $64 billion, up from $52 billion to $56 billion, and the company says investment from 2026 through 2028 will be "substantially higher" than the prior three years 34. Wei said in January that this spending adds little output before 2028 5. The last capex peak, in 2022, was followed by a 9 percent revenue decline in 2023 5. The stock has voted with the calendar: down 11 percent in October, about 16 times forward earnings 5.

The scarcity case cuts the other way. Anthropic's October 26 IPO filing says most advanced chip capacity sits at TSMC in Taiwan, that TSMC has at times been unable to meet demand, and that capacity outside Taiwan remains in early stages 6. Taiwan's Commercial Times reports a CoWoS price increase of up to 20 percent being prepared for the packaging step that joins an AI processor to its memory, which TSMC has not confirmed 78.

TSMC's capex is now climbing more than twice as fast as its revenue

  • Revenue
  • Capex
$0B$10B$20B$30B$40BQ4 '23Q2 '24Q4 '24Q2 '25Q4 '25Q2 '26Capex up 53% y/y; revenue up 25%
Data
RevenueCapex
Q3 '23$16.94B$7.02B
Q4 '23$20.36B$5.53B
Q1 '24$18.53B$5.66B
Q2 '24$20.7B$6.32B
Q3 '24$24.05B$6.55B
Q4 '24$26.73B$11.13B
Q1 '25$25.42B$10.02B
Q2 '25$31.95B$10.17B
Q3 '25$32.48B$9.43B
Q4 '25$33.45B$11.4B
Q1 '26$35.43B$10.9B
Q2 '26$39.85B$15.55B
Quarterly revenue and capital spending in US$ billions, from TSMC's SEC filings; the June 2026 quarter is the latest in the series.9

Sherman already has an incumbent

Texas Instruments−3.50% — Texas Instruments, down 3.50 percent today committed $46 billion last year to a 1,200-acre complex in Sherman, planned at four plants, one of them complete; GlobalWafers makes wafers across town 1. The city draws water from Lake Texoma, has bought water rights, and is planning an 84-inch pipeline running 27 miles to a second reservoir 1. If the state now pays for two more plants, the money lands beside the incumbent rather than with it. Texas has paid at this scale once already, Samsung's $44 billion Taylor complex, as we reported on October 17 1.

What settles it

Three readings matter: October revenue, due around November 10; any Texas incentive package for the two plants; and the 2027 guidance in mid-January 5. Anthropic$350B — Anthropic, private, latest valuation $350B prices its IPO in mid-November, a vote on the demand side of this ledger 2. Foreign funds have already moved, selling a net NT$994.3 billion of Taiwanese shares in October, and the Taiex, where TSMC is more than 40 percent of the index, broke its 120-day moving average on Friday 2. Sherman has the water for two chipmakers. Texas has not said which one it pays.

Get Chips by email, free

How AI demand is reshaping chipmakers, memory and the fabs behind them. In our daily email, every weekday.

Loading TSM

Reader comments

0 comments

    Chips

    Hewlett Packard Enterprise fell 6.42% after Intel's memory warning, with $11.8 billion of inventory

    Hewlett Packard Enterprise fell 6.42% on October 30 with no company news, a day after Intel's guidance cut put the AI memory shortage at the center of the tape. HPE is on the paying side of that shortage, holding nearly twice the inventory it carried last year.

    Chips

    HP fell 9% on Intel's PC warning as its insiders made seven sales and zero buys in six months

    The chipmaker told the market the PC correction is accelerating as AI bids up memory, and HP fell about 9% on October 30 with thinning margins, a shrinking 2027 planning assumption of its own, and seven insider sales against zero buys in six months.

    Chips

    Microchip's NASA spaceflight computer passes radiation tests as insiders sell $71 million, buying none

    Radiation milestones on a NASA-contracted spaceflight computer and the quiet purchase of radiation-hardened chipmaker VORAGO hand Microchip a second growth story. The stock's 115.6x trailing multiple already believes it; the November 5 earnings report is the first audit.

    Chips

    Arm reports November 4 with a $2 verdict and a clause that could erase five years of Qualcomm royalties

    Arm reports fiscal Q2 on November 4, five days after a single session took 11.6% off the stock. The quarter must clear a $1.38 billion revenue guide while a Delaware judge weighs a clause that could cut Qualcomm's royalties to zero for five years.

    Chips

    Germany hands Vishay a $241 million check for its power-chip fab, four days before its margin test

    Schleswig-Holstein's €215 million grant covers about a fifth of a €1 billion 300mm power-MOSFET fab at Itzehoe, four days before Vishay must show 24% gross margin. Shareholders already funded the first instalment with an $830 million share sale.

    Chips

    Sam Altman visited Samsung days after its record $80.5 billion quarter; its phone business lost money

    Sam Altman spent Saturday with about 50 Samsung executives in Yongin, days after Samsung posted KRW 107.4 trillion in quarterly operating profit, the first above KRW 100 trillion in tech history. The stock still trades 36% below its high: the fight is over whether memory is a franchise or one more commodity cycle.

    Get the newsletter

    The day's AI and market news, in your inbox every weekday.